5. A contaminated soil burial site may not be located less than 1 km upstream of any surface water intake used to supply a municipal waterworks or a waterworks system operated by the holder of a permit issued under section 32.1 of the Act.
The distance prescribed by the first paragraph shall be measured from the inside limit of the buffer zone that must surround every contaminated soil burial site in accordance with section 10.